Goliath Construction Goliath ConstructionGoliath Construction
  • Home
  • About
  • Construction
    • Why Use Us?
    • Proficiency
    • Lead Contractor
    • Onsite Managers
    • Concept & Development
  • Maintenance
  • Projects
  • Get a quote
  • Contact
Cobham Surrey 2
  • New Build Demolition of the existing house and complete new build.
  • Length 12 months

This standard new build house built in 2006 was transformed by goliath construction to the high specification from the client. A large side and rear extension doubled the foot print of the home allowing an extra large master bedroom with stunning en-suite, new utility and  beautifully open plan kitchen/living space opening onto a levelled Trex composite decking area taking inside/outside living up a notch.   With careful planning and design between the client and us we managed a relatively short programme and high spec finish to allow the client to move back in and enjoy their new home.

View Projects
Prev Next
© 2012-2020 Goliath Construction Ltd